You can schedule a report from the report viewer.
To schedule a report:
| 1. | On the report viewer toolbar, click |
|
New Schedule Dialog |
The New Schedule dialog has the following tabs:
| • | Schedule – When to run the scheduled job, and how often |
| • | Parameters – If the report was designed with input controls, which parameters the scheduled job will use |
| • | Output Options – The name of the output file, the output format and locale, and where the output file is stored |
| • | Notifications – Email options for sending the output to recipients and for sending administrative messages |
| 3. | Click Save. The Save dialog box appears. |
| 4. | In the Scheduled Job Name field, enter a name for the job. The description is optional. |
| 5. | Click Save to save the schedule. The job appears in the list of saved jobs for reports. |
For information on viewing, modifying, or deleting the schedules, see Scheduling Reports and Dashboards.
Recommended Comments
There are no comments to display.